WBSEDCL Net Metering for Homes in Siliguri: Process, Fees and Rules (2026)

How WBSEDCL net metering works for homes in Siliguri: steps, ₹1,000 fee, timelines, net metering vs net billing, and how it links to PM Surya Ghar subsidy.

By Brijstar Green Energy Updated

A rooftop solar site survey

The short answer

Any WBSEDCL consumer in Siliguri with a contract demand of at least 1 kW can get net metering for rooftop solar up to their contract demand. You apply with Form S1, pay a ₹1,000 fee for a normal home connection, install the system, and WBSEDCL inspects it, fits the net and generation meters and connects it to the grid.

What is WBSEDCL net metering and who can get it?

Net metering means the solar units your roof sends to the grid are subtracted from the units you take from the grid. You pay only for the difference. In West Bengal, the rules come from the WBERC Grid Interactive Rooftop Solar PV Regulations, 2025, and WBSEDCL follows them through its Procedures-C (2025) [1][3]. You can apply if you are an existing WBSEDCL consumer with a contract demand of at least 1 kW [1]. Your solar system can be from 1 kW up to your contract demand (the load sanctioned on your connection), with an upper limit of 500 kW [1][4]. So if your Siliguri home has a 2 kW contract demand and you want a 3 kW system, you first need to raise your load with WBSEDCL. This is the most common reason home applications get stuck, so check the contract demand on your bill before anything else.

Net metering, net billing or gross metering: which is best for a home?

WBSEDCL offers three options, and you choose one in your application form [1]. Under net metering, every unit you export cancels one unit you import. Under net billing, exported units are valued at a feed-in tariff, while imported units are charged at your normal tariff. Under gross metering, all the solar power is sold to WBSEDCL at the feed-in tariff, and you pay for all your use separately [1][3]. For 2025-26, the feed-in tariff for low and medium voltage connections, which covers most homes, was ₹4.37 per unit [1]. Once agreed, that rate stays for the life of the system [1]. For most families in Siliguri, Matigara or Bagdogra who use most of their solar power at home, net metering is the simplest choice, because each exported unit is worth a full unit off your bill. Gross metering suits only a few cases, such as a rooftop owner who wants to sell power rather than use it.

What is the step-by-step WBSEDCL net metering process?

The steps in WBSEDCL's procedure are [1][2]: 1) Apply online through Consumer Login on wbsedcl.in using the Solar PV Application tab, or at your local customer care centre, with Form S1. 2) WBSEDCL checks feasibility and issues a go-ahead and a quotation for the meters. 3) Pay the quotation; it covers the net meter, the generation meter and a modem where needed. 4) Sign the agreement form (S2 for net metering). 5) Get the system installed. 6) Submit the self-certified installation certificate (S5) with the panel maker's fitness certificate, and the electrical inspector clearance or self-certification (S6) for supply below 11 kV. 7) WBSEDCL does a connectivity inspection, installs the meters and synchronises your system with the grid. Under the 2025 regulations, home systems up to 10 kW are treated as technically feasible without a separate study, which saves time [3].

How much does net metering cost and how long does it take?

The application fee is ₹1,000 for low and medium voltage connections and ₹5,000 for high voltage connections; the procedure exempts government-funded projects or schemes [1]. You also pay the meter quotation, which follows WBSEDCL's standard meter charges for connections up to 170 kW [1]. WBSEDCL tests, installs and maintains the meters. If a WBSEDCL-supplied meter fails within 7 years, WBSEDCL replaces it at its own cost [1]. WBSEDCL's own targets are: site inspection within 15 days of the application, go-ahead within 20 days, connectivity inspection within 10 days after your completion forms, and meters, agreement and grid connection within 15 days after those forms [1]. These are official targets, not guarantees. Missing documents, a name mismatch or a pending load increase can add weeks, so get your papers right at the start.

How does net metering work with the PM Surya Ghar subsidy?

If you want the PM Surya Ghar subsidy, the net metering request runs through the national portal pmsuryaghar.gov.in. You register with your WBSEDCL consumer number, get feasibility, install the system through a registered vendor, upload the plant details and apply for the net meter. WBSEDCL then inspects the system and fits the net meter, and the subsidy is released after the commissioning certificate [5]. The central subsidy is ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more [5]. West Bengal gives no extra state subsidy, and the panels must be Indian-made DCR modules. Timing matters: as of September 2026, about 59.5 lakh homes in India had rooftop solar under the scheme, and it runs until 31 March 2027 [6]. The subsidy depends on finishing the net meter and inspection, not just applying, so homes in Siliguri and the rest of North Bengal should not leave this to the last month.

What happens to extra solar units at the end of the year?

Under net metering, extra units carry forward from one bill to the next. But at the start of each financial year (1 April), any surplus left over is reset to zero [1][4]. This means a system that is too big for your home will give away free power to the grid every year. The right size depends on your own yearly units, your contract demand and your roof space and shade. That is why a proper site survey, using 12 months of your WBSEDCL bills, is more useful than picking a size from a chart. A well-sized system uses up most of its credits within the year, so nothing goes to waste.

Why use a local installer in Siliguri for net metering?

Most delays in net metering happen at the local level: load increase, document mismatch, meter quotation, inspection and meter fitting. A Siliguri-based installer can visit the WBSEDCL office, fix issues quickly and stay available after installation. Brijstar Green Energy is a solar EPC company based in Siliguri, an authorised channel partner of Tata Power Solar, and a registered vendor on the PM Surya Ghar national portal for the WBSEDCL area. Brijstar files the subsidy application for you and handles WBSEDCL net metering liaison, design, installation, commissioning and after-sales service. Home solar loans can be arranged through partner banks SBI, PNB, Bank of Baroda, Canara Bank, Union Bank of India, Bank of India and Indian Bank, subject to bank approval. We serve homes in Siliguri, Matigara, Bagdogra, Jalpaiguri, Darjeeling and the rest of North Bengal. Book a free site survey with Brijstar: call or WhatsApp +91 99324 08999, or visit brijstar.com.

Common questions

Can I get net metering on a 1 kW WBSEDCL connection?

Yes. Any WBSEDCL consumer with a contract demand of at least 1 kW can apply, and the solar system can be as large as the contract demand.

What is the WBSEDCL net metering application fee?

₹1,000 for low and medium voltage connections, which covers most homes, and ₹5,000 for high voltage. Meter charges are extra as per WBSEDCL's quotation.

Does WBSEDCL pay for extra solar units under net metering?

No. Extra units carry forward through the year, but any surplus resets to zero at the start of each financial year. So size the system to your own use.

Do I need to increase my load before installing a bigger system?

Yes. The solar capacity cannot be more than your contract demand, so apply for a load increase first if needed.

Who installs the net meter?

WBSEDCL installs, tests and maintains the net meter and generation meter after your system passes the connectivity inspection.