PM Surya Ghar Last Date: Should Homes in Cooch Behar, North Bengal Install Solar Before March 2027?
PM Surya Ghar closes on 31 March 2027. See what it means for homes in Cooch Behar and the rest of North Bengal, and how to claim up to ₹78,000 in time.

The short answer
Yes. If you want the PM Surya Ghar subsidy of up to ₹78,000, plan to install rooftop solar well before 31 March 2027, when the scheme is set to close. The subsidy is paid only after WBSEDCL inspects your system, so homes in Cooch Behar and the rest of North Bengal should start now, not in the last month.
What is the last date of PM Surya Ghar Muft Bijli Yojana?
The PM Surya Ghar Muft Bijli Yojana is scheduled to end on 31 March 2027 [1][2]. The Government launched it in February 2024 with an outlay of ₹75,021 crore to help one crore homes put solar panels on their roofs [3]. News reports in September 2026 said the Centre is thinking about a short extension of three to four months, but nothing has been officially announced [4]. So the safe plan for any family in Cooch Behar, Malda, Siliguri or anywhere in North Bengal is to treat 31 March 2027 as the real deadline. Do not wait for an extension that may or may not come.
What is new this month, and does it affect my home?
On 12 October 2026, the Renewable Energy Secretary said the next phase of PM Surya Ghar may require Indian-made inverters and batteries, and may push battery storage with rooftop solar [2]. These are only proposals and no decision has been taken [1][2]. Today, only the solar panels must be Indian-made DCR modules (DCR means Domestic Content Requirement, so both the cells and the panels are made in India). What this means for you: the current rules are known and clear, and the subsidy amounts are fixed. The next phase may have new rules and possibly higher equipment costs, because India still makes very few battery cells [2]. If you are ready to install, the current scheme is the known option.
How much subsidy will I get, and how is it paid?
The central subsidy for a home is ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more (the subsidy stops increasing after 3 kW) [3][5]. West Bengal does not give any extra state subsidy on top of this. The subsidy is not a discount on the bill. You pay for the system first, and the Government sends the subsidy directly to your bank account after the system is installed and approved [5]. If you take a solar loan, it can be credited to your loan account. To qualify, you need a domestic WBSEDCL connection in your name, a roof you own, DCR solar panels, and a vendor registered on the national portal.
Why should I not wait until February or March 2027?
The subsidy is linked to the final approval, not the date you apply. The steps are: register on pmsuryaghar.gov.in, choose a registered vendor, get feasibility approval from WBSEDCL, install the system, upload photos and documents, get the WBSEDCL inspection and net meter, and then the subsidy is released [5]. Each step takes some time. In the last months of the scheme, lakhs of families across India will be trying to finish at the same time. Monthly installations need to rise by about 51% from the September 2026 pace to meet the target [1], so vendors, DCR panel supply, net meters and inspections may all get busy. A family that starts in November or December has much more room to fix any problem, such as a name mismatch on the electricity bill or a pending load increase.
What should a home in Cooch Behar or Malda do this month?
First, take your latest WBSEDCL bill and check that the name and consumer number are correct. Second, look at your monthly units to choose the right size; most homes using 250 to 400 units a month look at 3 kW, which also gets the full ₹78,000 subsidy. Third, get a site survey to check roof strength, shade from trees or nearby buildings, and the best panel direction. Fourth, if you need a loan, start the bank process early; under PM Surya Ghar, collateral-free loans for systems up to 3 kW are offered at around 7% interest [3]. Fifth, keep your Aadhaar, bank passbook and property papers ready. These five steps usually decide whether a project moves smoothly or gets stuck.
Why does a local installer matter for the deadline?
In the final months, delays usually happen at the local level: WBSEDCL feasibility, load changes, net meter installation and inspection. A local installer who knows the WBSEDCL offices in North Bengal can follow up in person and fix document issues fast. Brijstar Green Energy is based in Siliguri, is an authorised channel partner of Tata Power Solar, and is a registered vendor on the PM Surya Ghar national portal for the WBSEDCL area. Brijstar files the subsidy application for you, handles WBSEDCL net metering liaison, design, installation and commissioning, and stays available for service after installation. Home solar loans can be arranged through partner banks SBI, PNB, Bank of Baroda, Canara Bank, Union Bank of India, Bank of India and Indian Bank, subject to bank approval.
How do I get started with Brijstar?
The simplest first step is a site survey. Brijstar will check your roof, study your electricity bill, suggest the right system size and explain the full subsidy process before you decide anything. We serve homes in Cooch Behar, Malda, Siliguri, Jalpaiguri, Alipurduar, Darjeeling and the rest of North Bengal. Book a free site survey with Brijstar today: call or WhatsApp +91 99324 08999, or visit brijstar.com.
Common questions
Is PM Surya Ghar ending in March 2027?
Yes, the scheme is scheduled to end on 31 March 2027. A short extension has been discussed in news reports, but nothing is official yet.
If I apply before 31 March 2027, will I surely get the subsidy?
Not automatically. The subsidy is released only after the system is installed, inspected by WBSEDCL and approved on the portal, so it is best to finish well before the deadline.
Does West Bengal give any extra solar subsidy?
No. Homes in West Bengal get only the central subsidy: ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more.
Will the next phase need a battery?
It is not decided. The Government is only discussing ideas like battery storage and Indian-made inverters and batteries for the next phase.
Can I take a loan and still get the subsidy?
Yes. You can take a solar loan from a partner bank, subject to approval, and the subsidy can be credited to your loan account.
Sources and checks
- [1] Business Standard – PM Surya Ghar crosses 17.5 GW; rooftop additions fall for 2nd month (7 Oct 2026)
- [2] TaiyangNews – India May Mandate Local Inverters, Batteries For Rooftop PV (12 Oct 2026)
- [3] PM India – Cabinet approves PM Surya Ghar Muft Bijli Yojana
- [4] EQ Magazine – PM Surya Ghar Scheme Could Get Extension (5 Sep 2026)
- [5] Government of West Bengal – PM Surya Ghar Muft Bijli Yojana scheme details
Confirm current utility and scheme rules before purchase.