Request a survey

Subsidy & Schemes · West Bengal

PM Surya Ghar Phase 2 in 2027: Should Homes in Jalpaiguri Wait or Install Rooftop Solar Now?

MNRE says PM Surya Ghar Phase 2 may start around March 2027. What it means for Jalpaiguri homes, and why waiting can cost you the ₹78,000 subsidy.

By Brijstar Green Energy Updated

A rooftop solar site survey

The short answer

For most homes in Jalpaiguri, installing now is the safer choice. The current PM Surya Ghar subsidy of up to ₹78,000 is available today, while MNRE has only said Phase 2 will probably start around March 2027, with no details yet on subsidy amounts or rules. Waiting means paying full power bills and taking on unknown rules.

What did MNRE say about PM Surya Ghar Phase 2?

In early November 2026, a Joint Secretary of the Ministry of New and Renewable Energy (MNRE) said at an industry event that the second phase of PM Surya Ghar would probably start in March next year, that is, around March 2027 [1]. He said the plan for Phase 2 will be shaped through talks with the industry and other stakeholders, and that MNRE is also exploring special insurance products for rooftop solar [1]. That is all that has been said in public so far. There is no official order yet on what Phase 2 will pay, who will be eligible, or how applications made under the current scheme will be handled at the changeover. At the same event period, the Union Power and Renewable Energy Minister said about one lakh rooftop systems are now being installed every six days, with over 55.3 lakh systems installed as of 2 November 2026 against a target of one crore homes by 31 March 2027 [2]. For a family in Jalpaiguri, the key point is simple: Phase 2 is a plan, not yet a rulebook.

Is the current PM Surya Ghar subsidy still available in Jalpaiguri?

Yes. Homes in Jalpaiguri, and the rest of North Bengal, that have a valid domestic electricity connection from WBSEDCL can still apply under the current scheme. The West Bengal Government's own scheme page lists the central subsidy as ₹30,000 per kW for the first 2 kW (up to ₹60,000), ₹18,000 for the third kW, and a fixed ₹78,000 for systems of 3 kW and above [3]. In simple terms: about ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more [4]. This money is not a discount on the bill. The Government pays it into your bank account (or loan account, if you take a loan) after your system is installed, inspected and approved. West Bengal does not add any extra state subsidy on top; the state page shows only the central amount [3]. To qualify, the system must use DCR (made-in-India cell) solar modules, and you must apply through the national portal, pmsuryaghar.gov.in, choosing a vendor registered for your electricity company [3].

Will Phase 2 give a bigger subsidy than today?

Nobody can say yet. The news report on Phase 2 does not mention subsidy amounts, battery storage or eligibility at all [1]. You may see websites claiming that Phase 2 will give higher subsidies or cover batteries. Treat those claims with care unless they point to an official MNRE order. Government schemes can change in either direction: a new phase may keep the same amount, lower it as panel prices fall, or change the rules on who qualifies. Making a big home decision based on a guess is risky. What is certain today is the ₹78,000 cap for a 3 kW or larger home system under the current scheme [3][4].

What is the risk of waiting for Phase 2?

Waiting has three real costs. First, you keep paying your full WBSEDCL bill every month until your system is running. Second, there may be a gap or a rush. When a phase ends and a new one begins, portals, vendor lists and approval steps can change, and many people try to apply at the last minute. That can slow down inspection and net meter work. Third, there is the timeline itself. A rooftop system is not installed in one day. It needs a site survey, the online application, WBSEDCL feasibility and net meter steps, installation, inspection and then subsidy release. Each step depends on the electricity company and the portal, so no installer can promise a fixed date. Starting early gives your application room to finish under the rules you already know.

Which homes in Jalpaiguri should install now, and which can wait?

Install now if your monthly power bill is high, your roof is your own, it gets clear sun for most of the day, and you plan to stay in the house for many years. This fits most families in Jalpaiguri town, Dhupguri, Maynaguri and nearby areas who run fans, a fridge, a pump or an AC. It also makes sense if you want a solar loan, because PM Surya Ghar loans from public sector banks such as SBI, PNB, Bank of Baroda, Canara Bank, Union Bank of India, Bank of India and Indian Bank can be arranged, subject to bank approval. Waiting can make sense only in a few cases: if you are about to rebuild or add a floor to the house, if the roof needs major repair, if the house is rented, or if a tall building or trees shade most of the roof. In these cases, a site survey first will tell you whether solar suits your home at all.

Why does a local installer matter for PM Surya Ghar in Jalpaiguri?

The subsidy is only paid when every step is done right: correct DCR modules, proper earthing and structure, matching details on the portal, and WBSEDCL net metering. One wrong entry can hold up the money for months. Brijstar Green Energy is a Siliguri-based solar EPC company and a registered vendor on the PM Surya Ghar national portal for the WBSEDCL area. We do PM Surya Ghar home work only inside West Bengal, including Jalpaiguri and the rest of North Bengal. As an authorised channel partner of Tata Power Solar, we handle the site survey, system design, the subsidy application on the portal, WBSEDCL net metering liaison, installation, commissioning and service after installation. Because we are close by, we can visit your roof in person and come back quickly if anything needs attention. To find out what size of system suits your home and how the current subsidy applies, book a free site survey with Brijstar: call or WhatsApp +91 99324 08999, or visit brijstar.com.

Common questions

When will PM Surya Ghar Phase 2 start?

An MNRE official said in November 2026 that Phase 2 will probably start around March 2027. No official order with dates or rules has been published yet.

Is the ₹78,000 subsidy still available for homes in Jalpaiguri?

Yes. Under the current scheme, homes with a WBSEDCL domestic connection can get up to ₹78,000 for a 3 kW or larger system, paid by the Government after installation and approval.

Will Phase 2 give a higher subsidy or cover batteries?

There is no official information on this yet. Be careful of websites that claim higher subsidies without pointing to an MNRE order.

Does West Bengal give an extra state subsidy?

No. The West Bengal Government's scheme page lists only the central subsidy. There is no extra state top-up.

Can I take a loan for rooftop solar under PM Surya Ghar?

Yes. Brijstar can help arrange loans through partner banks like SBI, PNB, Bank of Baroda, Canara Bank, Union Bank of India, Bank of India and Indian Bank, subject to bank approval.

Sources and checks

Confirm current utility and scheme rules before purchase.