Subsidy · West Bengal
Is There a Solar Battery Subsidy for Homes in 2026? What Families in Raiganj and Islampur Should Know
Solar battery subsidy 2026 explained for Raiganj and Islampur homes: what PM Surya Ghar pays today, the new battery proposal, and whether to wait.

The short answer
No. As of 1 November 2026 there is no government subsidy for home solar batteries. PM Surya Ghar pays ₹30,000 to ₹78,000 only for the solar system. A think tank has proposed a battery subsidy in the scheme's next phase, but the Government says no decision has been taken, so plan without it.
Is there a subsidy for solar batteries for homes right now?
No. Today the PM Surya Ghar: Muft Bijli Yojana subsidy covers only the rooftop solar system, not a battery. The central rule is ₹30,000 per kW up to 2 kW, ₹18,000 per kW for extra capacity up to 3 kW, and a total cap of ₹78,000 for systems larger than 3 kW [4]. In simple terms: ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or bigger. You pay the full price first, and after commissioning the Centre sends the subsidy directly to your bank account [3]. The system must use DCR (Domestic Content Requirement) modules, which are panels made with Indian cells. If you add a battery today, you pay for the battery yourself. This is true for homes in Raiganj, Islampur and every other WBSEDCL area in West Bengal.
What is the new battery subsidy news everyone is talking about?
On 26 October 2026, an analysis by Ember, an energy think tank, was published proposing that the next phase of PM Surya Ghar should give a subsidy for home batteries along with solar [1]. Ember's example was a subsidy of 50% on the battery cost. It said that if even half of the scheme's one crore home target got such support, India could build 15 to 25 GWh of small battery storage spread across homes [1]. Ember also suggested that states could add their own top-up aimed at the battery cost, as Tamil Nadu and Bihar have topped up the central solar subsidy [1]. This is a proposal from a research group. It is not a government decision and it is not a scheme you can apply for.
Has the Government decided on a battery subsidy for PM Surya Ghar?
Not yet. Business Standard reported on 7 October 2026 that MNRE, the Ministry of New and Renewable Energy, started talks with industry and experts in August about what should follow the current scheme [2]. Adding battery storage to rooftop solar is one of the ideas received. But the report clearly says the talks are at an early stage and no decision has been taken on any change to the present subsidy [2]. The same report says the current scheme is scheduled to run until 31 March 2027 [2]. So any battery support, if it comes at all, is likely to be part of a future phase, and nobody can say today what it will pay, who will qualify, or when it will start.
How much does a battery change the cost and payback for a home?
A battery adds a lot of cost. Ember modelled a 3 kW home system for a family using 350 units a month. It found that solar alone, after the ₹78,000 subsidy, cost about ₹87,000 and paid back in about 3.3 years [1]. When a 5 kWh battery was added without any support, payback went to more than nine years [1]. With its proposed 50% battery subsidy, Ember estimated payback would come down to about 6.3 years [1]. These are Ember's model figures, not prices from Brijstar, and your real numbers will depend on your bill, roof and equipment. The lesson is simple: for most homes on WBSEDCL supply, the solar part gives the fastest return, and a battery is mainly about backup during power cuts, not savings.
Should homes in Raiganj and Islampur wait for a battery subsidy?
For most families, no. First, the solar subsidy of up to ₹78,000 is available now, but the scheme is scheduled to end on 31 March 2027 unless it is officially extended [2]. Second, a battery subsidy is only a proposal and may never come, or may come with different rules. Third, every month you wait you pay your full electricity bill. A practical path is to install an on-grid solar system now with the PM Surya Ghar subsidy and WBSEDCL net metering. If you face frequent power cuts and want backup, ask your installer to design a system that can take a battery later, so you can add one if a subsidy is announced or when prices suit you. Do not count any battery subsidy in your budget until an official MNRE order is published.
How do you apply for the solar subsidy in Uttar Dinajpur today?
The steps are the same in Raiganj, Islampur and the rest of Uttar Dinajpur. 1) Register on the PM Surya Ghar national portal (pmsuryaghar.gov.in) with your WBSEDCL consumer number and mobile number. 2) Choose a registered vendor. 3) The vendor surveys your roof, checks shade and roof strength, and designs the system; the Centre says technical feasibility checks are waived for systems up to 10 kW [3]. 4) The system is installed with DCR modules. 5) WBSEDCL installs the net meter and inspects the system. 6) After commissioning, you submit your bank details and the subsidy is credited [3]. Collateral-free loans are also available under the scheme at around 5.75% interest for up to 10 years, as reported by the Centre [3]. Brijstar can arrange home solar loans through SBI, PNB, Bank of Baroda, Canara Bank, Union Bank of India, Bank of India and Indian Bank, subject to bank approval.
Why choose a local installer in North Bengal, and what should you do next?
Rooftop solar in Raiganj and Islampur depends on local work: a proper roof survey, planning for heavy monsoon rain, follow-up with the WBSEDCL office for the net meter, and quick service after installation. Brijstar Green Energy Pvt Ltd is a Siliguri-based solar EPC company working across North Bengal and an authorised channel partner of Tata Power Solar. Brijstar is a registered vendor on the PM Surya Ghar portal for the WBSEDCL area, files the subsidy application for you, and handles WBSEDCL net metering liaison, design, installation, commissioning and after-sales service. We will also tell you plainly whether a battery makes sense for your home, and we will apply only the subsidy that is officially notified at the time of your application. Book a free site survey with Brijstar — call or WhatsApp +91 99324 08999, or visit brijstar.com.
Common questions
Does PM Surya Ghar give a subsidy for solar batteries?
No. As of 1 November 2026 the subsidy covers only the solar system: up to ₹78,000 for 3 kW and above [4]. A battery subsidy has been proposed but not decided [1][2].
When will the battery subsidy for home solar start?
Nobody can say. MNRE is only in early talks about the scheme's next phase and has not taken any decision [2]. Wait for an official order before counting on it.
Can I add a battery to my PM Surya Ghar system later?
Yes, if the system is designed for it. Ask your installer for a design and inverter choice that allows a battery to be added later.
Is a battery worth it for a home in Raiganj?
Mainly if you need backup during power cuts. Ember's model shows a battery without support stretches payback from about 3.3 years to over nine years [1].
What is the last date for the PM Surya Ghar subsidy?
The scheme is scheduled to run until 31 March 2027 [2]. Check for any official extension before you plan.
Sources and checks
- [1] ESS News (Ember analysis): India rooftop solar subsidy could unlock up to 25 GWh of battery storage, 26 Oct 2026
- [2] Business Standard: PM Surya Ghar crosses 17.5 GW; rooftop additions fall for 2nd month, 7 Oct 2026
- [3] pv magazine India (MNRE): PM Surya Ghar crosses 60-lakh mark, 8 Oct 2026
- [4] Delhi Solar Portal (GNCTD): Central subsidy under PM Surya Ghar for residential households
Confirm current utility and scheme rules before purchase.