ALMM List-II Deadline (31 Dec 2026): Should Businesses in Malda and Other North Bengal Towns Install Rooftop Solar Now?

ALMM List-II deadline 31 Dec 2026: what it means for business rooftop solar in Malda and North Bengal, likely cost impact and what to check now.

By Brijstar Green Energy Updated

A rooftop solar site survey

The short answer

Business rooftop solar projects under net metering must be commissioned by 31 December 2026 to use ALMM List-I approved panels without the List-II (approved, Indian-made cell) condition. After that date, panels must use List-II cells, which currently cost more. Businesses in Malda and other North Bengal towns that are planning solar should start now. [1][2]

What is ALMM List-II, and why does it matter for businesses?

ALMM is the government's Approved List of Models and Manufacturers. List-I covers solar modules (panels). List-II covers solar cells, the small units inside each panel that turn sunlight into power. List-II came into force on 1 June 2026 [7]. Under this rule, covered projects must use approved modules that are made with cells from List-II makers [2]. In simple words, both the panel and the cells inside it must come from approved factories. Net metering projects are covered by this rule [1]. So if your factory, hotel, school, hospital or cold storage in Malda or Raiganj plans a grid-connected rooftop system under net metering, this rule decides which panels you can use.

What is the 31 December 2026 deadline?

On 18 July 2026, MNRE gave a limited window: net metering projects and open access projects can be commissioned without the List-II cell condition until 31 December 2026 [1]. The earlier window had ended on 31 May 2026 [1]. These projects must still use panels approved under ALMM List-I [3]. Projects commissioned after 31 December 2026 must follow List-II [2]. MNRE called this a one-time transition window and said there will be no blanket extension [1][2]. The key word is commissioned. The date that counts is when your system is connected and commissioned, not the date you sign the order or pay the advance.

Will business rooftop solar cost more after 31 December?

It may. Panels made with Indian cells (often called DCR panels, meaning Domestic Content Requirement) currently cost more than panels made with imported cells. Industry reports published this week say the widening price gap between DCR and non-DCR modules is raising rooftop installation costs and lengthening payback periods [4][5]. A June 2026 Crisil analysis, quoted by TaiyangNews, expected domestic cell supply to meet only around half of India's 60–65 GW demand this financial year [2]. Tighter supply can mean higher prices and longer delivery times. Nobody can predict exact prices, and they change every month. But a business that is already planning solar should get its site survey, design and quotation done now, so it can decide with full information before the window closes.

Can a business in Malda or Raiganj still finish before 31 December?

It depends on system size, how ready the roof is, and WBSEDCL approval. Under the WBERC rooftop solar regulations, 2025, systems up to 10 kW are accepted automatically, and larger systems need a technical feasibility study by the distribution company [6]. The application fee is ₹1,000 for low and medium voltage consumers and ₹5,000 for high voltage consumers, and the distribution company must respond within 20 days [6]. Most business systems are above 10 kW, so the feasibility step applies. Then add time for design, structure work, material delivery, installation, inspection and meter fitting. With about two months left, small and medium systems on a ready roof have the best chance. Very large projects may not make it. No installer can guarantee WBSEDCL approval or commissioning dates, so be careful with anyone who promises a fixed date.

What should you check in your solar quotation now?

Ask five simple questions. One: are the panels on ALMM List-I? Ask for the exact model number. Two: if commissioning slips past 31 December, will these panels still be allowed, or are they made with List-II cells? Three: what is the planned commissioning date, and what happens if it moves? Four: is the WBSEDCL net metering application included, and who follows it up? Five: what after-sales service and generation monitoring is included? Get all answers in writing. Do not cut corners on structure strength, earthing, cable size or safety just to beat a deadline. A solar system runs for decades, and a rushed job can cost far more than any price saving.

Why work with a local installer like Brijstar?

Deadline projects need fast and careful work on the ground. Brijstar Green Energy is a solar EPC company based in Siliguri, working for businesses across North Bengal, Sikkim and beyond. We handle the site survey, system design, WBSEDCL net metering liaison, installation, commissioning and after-sales service. Being local means quicker site visits, regular follow-up with WBSEDCL, and a service team that can reach Malda, Raiganj, Cooch Behar and other North Bengal towns when you need it. Brijstar is an authorised channel partner of Tata Power Solar and also offers other leading brands for commercial clients, plus battery storage (BESS) and EV charging for businesses. To check whether your project can realistically be commissioned before 31 December 2026, book a free site survey with Brijstar — call or WhatsApp +91 99324 08999, or visit brijstar.com.

Common questions

Is the deadline based on the order date or the commissioning date?

The commissioning date. Net metering and open access projects commissioned after 31 December 2026 must follow ALMM List-II. [2]

Will the government extend the 31 December 2026 deadline?

MNRE has said this is a one-time window and that no blanket extension will be given. Plan as if the date is final. [1]

What happens if my project is commissioned after 31 December 2026?

Your panels must then be made with cells from ALMM List-II makers. The project can still go ahead, but panel choice changes and cost may be higher. [2][4]

Does this change PM Surya Ghar for homes?

Homes that take the PM Surya Ghar subsidy already have to use DCR panels made with Indian cells, so this deadline mainly matters for businesses. Businesses do not get the PM Surya Ghar subsidy.

Does Brijstar do commercial solar outside West Bengal?

Yes. Brijstar does commercial and industrial solar across North Bengal, Sikkim and beyond.

Sources and checks

Confirm current utility and scheme rules before purchase.