Net Metering vs Net Billing vs Gross Metering: Which Is Best for Businesses in Cooch Behar, North Bengal? (2026)

WBERC rooftop solar rules explained for businesses in Cooch Behar: net metering, net billing or gross metering, the 500 kW cap, fees and how to choose.

By Brijstar Green Energy Updated

A rooftop solar site survey

The short answer

For most businesses in Cooch Behar that use most of their solar power during the day, net metering is usually the best fit, because each exported unit offsets a unit you buy at the full grid rate. Net billing pays exported units at a lower feed-in tariff, and gross metering sells all generation at that tariff.

What are the new rooftop solar rules in West Bengal?

West Bengal's power regulator, WBERC, notified the Grid Interactive Rooftop Solar Photovoltaic System for Prosumers Regulations, 2025. They apply to all grid-connected rooftop solar systems in the state, including WBSEDCL areas such as Cooch Behar, Jalpaiguri, Siliguri and the rest of North Bengal [1]. A 'prosumer' simply means a power consumer who also produces power from their own rooftop. The rules became effective from 31 July 2025 [4] and replaced the earlier 2020 provisions [2]. Under these rules, a business can choose one of three ways to connect solar to the grid: net metering, net billing or gross metering [1]. The choice decides how much value you get for the solar power you send to the grid, so it matters a lot for your payback.

What is the difference between net metering, net billing and gross metering?

In net metering, one bi-directional meter records the units you take from the grid and the units you send to it. Exported units are subtracted from imported units, so every exported unit saves you a unit at your normal tariff [4]. In net billing, the units you buy are charged at the normal retail tariff, but the units you export are valued at a feed-in tariff fixed by WBERC [4]. WBSEDCL's model net billing agreement works this out in rupees: your import bill minus your export value, minus any credit carried forward [3]. In gross metering, you pay for all the power you take from the grid, and all your solar generation is credited at the feed-in tariff [4]. The feed-in tariff for net billing and gross metering is set by WBERC and stays fixed for the 25-year life of the system [4].

Which option is best for a shop, factory, hotel or school in Cooch Behar?

It depends on when you use power. Most businesses in Cooch Behar, such as rice mills, cold rooms, shops, offices, hospitals and schools, use most of their power during daytime working hours. For them, the best plan is to size the solar plant so that most of the power is used on site. Every unit you use directly saves you a unit at your full tariff, whatever option you choose. The option only changes the value of the extra units you export. If you export a little and the feed-in tariff is lower than your grid tariff, net metering usually gives more value, because exported units are counted at the full rate. Gross metering suits only those who want to sell all their solar power and keep buying from the grid as before. Ask your installer to compare all three with your last 12 months of bills before you decide.

Is there a size limit for business rooftop solar in West Bengal?

Yes. Rooftop solar is allowed for consumers with a sanctioned load of at least 1 kW, and the system size is capped at 500 kW or your sanctioned load, whichever is lower [2]. Your system cannot be bigger than your sanctioned load or contract demand [1]. So a factory with a 200 kW contract demand can install up to 200 kW, not more. Also, the total rooftop solar connected on a feeder or transformer cannot exceed 100% of its capacity [4]. WBERC has also set yearly capacity targets for each distribution company, and for 2026-27 the figure for WBSEDCL is 195 MW [2]. Applications are handled on a first-come, first-served basis [1], so it is better to apply early.

What happens to extra solar credit at the end of the year?

Under net metering, surplus units that offset your imports are carried forward, but the surplus resets every year [2]. Under net billing, any rupee credit left at the end of the financial year is reset to zero, as written in WBSEDCL's model agreement [3]. This means you are not paid in cash for a large yearly surplus. In simple words, a plant that is too big for your own use will waste value. This is why correct sizing, based on your real monthly load and roof area, is the most important step for a business owner in Cooch Behar.

What is the process, fee and timeline with WBSEDCL?

You apply online to the distribution company, and hard copies are also accepted. The application fee is ₹1,000 for low and medium voltage consumers and ₹5,000 for high and extra-high voltage consumers [1]. Systems up to 10 kW are approved without a technical feasibility study, while larger systems need a study that the discom must finish within 15 days [2]. After clearance, the system must be installed within 180 days, with a possible 90-day extension [1]. Meters must follow the rules: net metering and net billing need a net meter plus a generation meter, and all meters must support smart metering (AMI) [1]. Anti-islanding protection is compulsory, and if you add batteries, the system must not push power to the grid during an outage [1]. The net billing agreement with WBSEDCL is valid for 25 years or the life of the system, whichever is earlier [3].

Why should a Cooch Behar business work with a local installer?

Getting the option and the size right needs a proper site survey, a study of your bills, and careful paperwork with WBSEDCL. Brijstar Green Energy Pvt Ltd is a solar EPC company based in Siliguri that works for businesses across North Bengal, Sikkim and beyond. We handle design, WBSEDCL net metering liaison, installation, commissioning and after-sales service. We offer leading module and inverter brands for commercial clients, including Tata Power Solar, as well as battery storage (BESS) and EV charging for businesses. Note that businesses do not get the PM Surya Ghar subsidy, which is only for homes. To find out whether net metering, net billing or gross metering suits your business, book a free site survey with Brijstar: call or WhatsApp +91 99324 08999, or visit brijstar.com.

Common questions

Can a business in Cooch Behar get net metering from WBSEDCL?

Yes. Under the WBERC 2025 rules, consumers with a sanctioned load of 1 kW or more can install grid-connected rooftop solar and choose net metering, net billing or gross metering.

What is the maximum rooftop solar size for a business in West Bengal?

Up to 500 kW or your sanctioned load or contract demand, whichever is lower.

Will WBSEDCL pay me cash for extra solar units?

No cash for a yearly surplus. Unused credit is reset at the end of the year, so size the plant to your own use.

What is the application fee for business rooftop solar in West Bengal?

₹1,000 for low and medium voltage consumers and ₹5,000 for high and extra-high voltage consumers.

Do businesses get PM Surya Ghar subsidy?

No. PM Surya Ghar subsidy is only for homes. Businesses pay the full cost but save on high commercial power bills.

Can I add batteries to a net-metered business solar plant?

Yes, battery storage is allowed, but the system must not send power to the grid during a power cut.

Sources and checks

Confirm current utility and scheme rules before purchase.