Request a survey

Subsidy & Policy · West Bengal

WBSEDCL 1 kW Rooftop Solar Tender for 1 Lakh Homes: What It Means for Families in Raiganj and Uttar Dinajpur (2026)

WBSEDCL plans 1 kW rooftop solar for 1 lakh homes under PM Surya Ghar. What it means for Raiganj families, and when applying yourself is better.

By Brijstar Green Energy Updated

A rooftop solar site survey

The short answer

WBSEDCL has invited bids to install 1 kW rooftop solar systems for one lakh home consumers in West Bengal under the PM Surya Ghar utility-led model. Districts, eligibility and consumer cost are not yet public. Families in Raiganj who need more than 1 kW can still apply themselves and get up to ₹78,000 subsidy.

What has WBSEDCL announced?

In November 2026, WBSEDCL (West Bengal State Electricity Distribution Company Ltd) invited bids for an estimated ₹550 crore project to put rooftop solar on the homes of one lakh consumers under PM Surya Ghar: Muft Bijli Yojana [1]. Each home is to get a 1 kW system, about 100 MW in total [1]. The work will be done under the utility-led aggregation (ULA) model. The chosen contractors must design, supply, install and commission the systems, connect them to the grid through gross metering, and maintain them for 10 years [1]. The tender notice is dated 6 November 2026, the pre-bid meeting is on 18 November and bids close on 9 December 2026 [1]. This is a tender for installers. It is not yet an open application window for homeowners.

What is the utility-led aggregation (ULA) model?

Under PM Surya Ghar, most homes take the normal route: the family applies on the national portal, picks a registered vendor, pays for the system and gets the subsidy later. Under ULA, a state utility like WBSEDCL installs rooftop solar on many homes together, on behalf of the households [2]. MNRE's guidelines allow two types. In one, the utility owns the system for at least five years. In the other, the household owns it from the day it is commissioned, and the utility may collect a small contribution of up to ₹5,000 per kW from the consumer [2]. Under ULA, the central subsidy is paid to the utility, not to the household, and the household gives consent for this on the national portal [2]. ULA is only for homes of up to 3 kW, and homes that already have rooftop solar are not eligible [2].

Which homes in Raiganj and North Bengal will get it, and will it be free?

This is not yet known. The news report on the tender does not name districts, does not say which consumers will be selected, and does not say whether the household pays anything [1]. MNRE's guidelines also do not fix how utilities pick households [2]. So nobody can yet say if Raiganj, Islampur or other towns in Uttar and Dakshin Dinajpur will be covered. The tender uses gross metering, where the power goes to the grid through a separate meter, so how the household benefits on its bill will depend on WBSEDCL's final terms [1]. Watch for official notices from WBSEDCL. Do not pay any agent who asks for money to put your name on a list. No such list has been announced.

Should my family wait for the WBSEDCL scheme or apply now?

It depends on your need. A 1 kW system is small. If your family wants to cut a large part of a high electricity bill, you will likely need a bigger system, and only a site survey can tell the right size. On the normal route, the central subsidy is ₹30,000 for 1 kW, ₹60,000 for 2 kW and ₹78,000 for 3 kW or more [3][4]. You choose the size, the vendor and the brand, and you use net metering so the solar power reduces your own bill. The subsidy is sent directly to your bank account through Direct Benefit Transfer [3]. Time also matters. MNRE's guidelines say the scheme runs till 31 March 2027 [2]. An MNRE official has said a second phase may start around March 2027, but no details or subsidy amounts have been announced [5]. Waiting for a scheme with unknown terms can mean missing the current one.

What do I need to apply on my own under PM Surya Ghar?

You need a valid domestic electricity connection in your name, your own house with a suitable roof, and you must not have taken a subsidy for the same rooftop system before [3]. Keep ready your latest WBSEDCL bill, identity proof and bank account details [3]. The panels must be DCR modules, which means made in India with Indian cells; non-DCR panels do not get the subsidy [2]. The steps are: register on pmsuryaghar.gov.in with your WBSEDCL consumer number, choose a registered vendor, get feasibility approval, install the system, apply for the net meter, pass WBSEDCL inspection, and then submit your bank details for the subsidy. West Bengal gives no extra state subsidy on top of the central amount.

Why does a local installer matter in Uttar Dinajpur?

Most delays in rooftop solar happen at the site survey, the WBSEDCL net meter and the inspection stage, not on the roof. A local team can check your roof, shade and load in person, file papers correctly the first time and follow up with WBSEDCL offices. It is also close by for service in the years after installation. Brijstar Green Energy is a solar EPC company based in Siliguri and an authorised channel partner of Tata Power Solar. Brijstar is a registered vendor on the PM Surya Ghar national portal for the WBSEDCL area and files the subsidy application for customers. It handles design, installation, commissioning, WBSEDCL net metering liaison and after-sales service. Home solar loans can be arranged through SBI, PNB, Bank of Baroda, Canara Bank, Union Bank of India, Bank of India and Indian Bank, subject to bank approval. Want to know the right size for your home in Raiganj, Islampur or the rest of North Bengal? Book a free site survey with Brijstar: call or WhatsApp +91 99324 08999, or visit brijstar.com.

Common questions

Is WBSEDCL giving free solar panels to homes?

WBSEDCL has invited bids to install 1 kW systems on one lakh homes under PM Surya Ghar. Whether households pay anything has not been announced yet.

Can I apply for the WBSEDCL 1 kW scheme now?

No application window for homeowners has been announced. The current step is a tender for installers, with bids due on 9 December 2026.

Will I get the ₹78,000 subsidy under the utility-led model?

No. Under the utility-led model the central subsidy is paid to the utility, not to the household, and it covers homes of up to 3 kW only.

Which is better for a family with a high bill: 1 kW from WBSEDCL or my own 3 kW system?

A bigger system covers more of your bill. On your own route, 3 kW or more gets up to ₹78,000 subsidy. A site survey tells the right size.

What is the last date for PM Surya Ghar?

MNRE's guidelines say the scheme runs till 31 March 2027. A second phase has been mentioned, but no official details are out yet.

Sources and checks

Confirm current utility and scheme rules before purchase.